| 
 S. No 
 | 
 Name of  the Faculty 
 | 
 Project  Title 
 | 
 Funding Agency 
 | 
 Duration 
 | 
 Amount 
 | 
| 
 1 
 | 
 K.Gopalakrishnan 
 | 
 Hardness Test 
i. Without heat treatment 
ii. With heat treatment 
Compression  Test 
Concrete cubes 
Tensile Test - Mild steel 
 | 
  RR Construction, 
63,Sakthi Mahal, Perundurai road, Erode, Tamil Nadu. Pin-638001. 
 | 
 June 2015 
to 
Oct 2017 
 | 
 11,275.00 
 | 
| 
 2 
 | 
 Mr.P.Chakravarthi 
 | 
 Plastic Mould Die Inserts 
 | 
 Hi tech CNC Industries 
Nagapattnam. 
 | 
 Continuous 
 | 
 10,000.00 
 | 
| 
 3 
 | 
 Mr.P.Chakravarthi 
 | 
 PVC Pipe Mould Die Crusher Die Component 
 | 
 Kasi Engineering, 
Plot No.1/52-A1, Metha Nagar Block, 
Thiruvagoundanoor, Salem. 
 | 
 Jan 2016 
to 
May 2016 
 | 
 48,000.00 
 | 
| 
 4 
 | 
 Mr.G.Gowrisankar 
 | 
 Mini Construction Lift 
Wheel Barrow 
Goods Lift Machine 
 | 
 United Manufacturer India 
No 516/228, D.Annapuram, 
Junction Main Road, Salem. 
 | 
 Nov 2016 
to 
May 2017 
 | 
 15,000.00 
 | 
| 
 5 
 | 
 Mr.A.Mohanraj 
 | 
 Product Development, Part Programming Code Generation and Machining of Mixer Drive Shaft 
 | 
 United Manufacturer India 
No 516/228, D.Annapuram, Junction Main Road, Salem.  | 
 21.09.2019 
to 
21.04.2021 
 | 
 49640.00 
 | 
| 
 6 
 | 
 Mr.P.Chakravarthi 
 | 
 Product Development ,Part Programming Code Generation and Machining of Mini Lift Gear Box 
 | 
 S.M.W. Hydraulics (India), Thottipalayam, Bhavani, Erode 
 | 
 01.08.2019 
to 
05.12.2019 
 | 
 144000.00 
 | 
| 
 7 
 | 
 Mr.P.Chakravarthi 
 | 
 Measuring the inter abutment distance of 4 inplants in X,Y & Z axis 
 | 
 KSR Institute of Dental Science and Research KSR Kalvi Nagar, Kuchipalayam Post, Tiruchengode – 637215 
 | 
 03.11.2019 
to 
15.11.2019 
06.01.2022 to 
10.01.2022 
 | 
 5200.00 
 | 
| 
 8 
 | 
 Mr.S.Balamurugan 
 | 
 Reconditioning of Roll Mill Rollers set 
 | 
 Vela Smelters, Valarigate, Tiruchengode. 
 | 
 29.11.2019 
to 
20.12.2021 
 | 
 68300.00 
 | 
| 
 9 
 | 
 Mr.M.Amarnath 
 | 
 Design and manufacturing of Auto gluing Machine     
( Horizontal and Vertical) 
 | 
 Lakshmi precision, 
Bangaluru 
 | 
 05.09.2019 
to 
04.02.2022 
 | 
 114000.00 
 | 
| 
 10 
 | 
 Dr.P.Gopinath 
 | 
 Design and fabrication of Soda Bottle Racks 
 | 
 Nester Love Q Soft Drinks 
 | 
 08.10.2019 
 to 
24.11.2019 
 | 
 49500.00 
 | 
| 
 Total 
 | 
 514595.00 
 | 
||||
| S. No | Name of the Faculty | Project Title | Funding Agency | Duration | Amount | 
| 1 | 
 Dr.P.Kanakarajan 
Mr.S.Balamurugan  | 
Reconditioning of Roll Mill Rollers set | Vela Smelters, Valarigate, Tiruchengode. | 
 10.08.2022 
to 17.03.2023  | 
1,00,000 | 
| 2 | 
 Mr.M.Amarnath 
Mr.R.Vasanthakumar 
 | 
Design and manufacturing of Special Sheet Shearing machine | Lakshmi precision,Bangaluru | 
 11.08.2022 
to 10.05.2023  | 
1,27,000 | 
| 3 | 
 Dr.P.Gopinath 
Mr.A.Mohanraj 
 | 
Design and fabrication of Soda Bottle Racks | Nester Love Q Soft Drinks | 
 08.07.2022 
to 
20.04.2023 
 | 
1,10,000 | 
| 
  Total 
 | 
  3,37,000 
 | 
||||